The Great Bathroom Renovation, November
& December 2005
Page 1
SHOWER ROOM
|
|
The
shower room before the renovation
|
The
shower room after the wall had been stripped (old floor tile still in
place)
|
|
|
With
the new wall tile and bathtub
|
Here
you can see the new floor tile as well. The second toilet will go
where the pipes under the window are.
|
TOILET ROOM
|
|
The
toilet room after the wall had been stripped (old floor tile still in
place) and the toilet removed
|
The
new wall tile is up, but not the floor tile yet
|
|
|
The
pipes up top are for gas (that's normally where the water heater would
be), and the ones below are where the second sink will go
|
Our
toilet is back in and functioning! Also you can see the new floor
tile here.
|
KITCHEN
(No, the kitchen is not being
renovated, but nevertheless it has been affected by the work)
|
|
Some
of the men's clothes, water bottle, and food
|
The
dirt and machinery on the kitchen floor
|
|
|
The
dirt on the kitchen balcony
|
The
men's tea set-up (on the table)...you can also make out more clothes
under the table
|